
Floor area by type, base, and transitions,measured off the finish schedule.
Ruh AI measures the floor area by type, with base and transitions, off your finish schedule, priced on your own rates and signed by your estimator.
- ✓Floor area in square feet by room and flooring type
- ✓Base in linear feet, transitions and thresholds counted
- ✓Live in about a week on Bluebeam, Procore, and Excel

The flooring bid crew.
The agents that carry a flooring set from measured takeoff to a priced, signed proposal.
From finish schedule to priced flooring bid, one motion.
Send the flooring set
Floor plans, the finish schedule, floor pattern sheets, and the Division 09 spec, straight from the invitation. Sheet and schedule classification starts immediately.
Area, base, and transitions run
Floor area measured by room and flooring type and totaled in square feet, base measured in linear feet along every wall, and transitions and thresholds counted at every material change with pattern and waste factors applied.
System and prep priced
Carpet, LVT, resilient, tile, and polished concrete, base, transitions, and underlayment priced by square foot on your own assemblies and history, with substrate prep and moisture mitigation carried where the scope calls for it.
Your estimator signs
Review by confidence and coverage score, adjust the assumptions, and export into your own proposal format.

The flooring bid squeeze.
Coverage decides the year
Flooring subs bid more square footage than a small estimating room can measure by hand. Every set that sits unpriced is a job that goes to the sub who got a number out first.
The transitions hide the margin
Floor area is the easy part. The margin hides in the base, the transitions and thresholds, the pattern and waste, the substrate prep, and the material changes that are easy to miss on a fast manual takeoff.
Lump-sum leaves no room to be wrong
Most flooring goes out as a lump sum. A missed transition, the wrong waste factor, or a light prep number does not surface in a change order. It comes straight off the crew's margin.
AI flooring takeoff and estimating, explained.
The takeoff is the bid
Flooring estimators tell us the same thing: the number is only as good as the quantities behind it, and measuring floor area by room and pulling base and transitions by hand off a PDF takes hours. When the area, the base, and the transition count run as one measured pass on the real finish schedule and floor plans, the same room prices more sets and keeps senior judgment on the systems, the patterns, and the waste factors, which is where a flooring bid is actually won or lost.
Built for how floors are measured
Carpet, LVT, resilient, tile, and polished concrete are different takeoffs, and the pipeline treats them that way. Floor area is measured by room and flooring type off the plans and finish schedule, base is measured in linear feet along every wall, transitions and thresholds are counted at every material change and doorway, pattern and waste factors are applied per the layout, and substrate prep, underlayment, and moisture mitigation are taken off the scope and reconciled against the finish schedule and the Division 09 spec. Material changes are broken out so you are not pricing tile at the carpet rate.
Priced on your book, signed by your estimator
The quantities are priced across nine stages on your own historical rates and assemblies for the systems you install, whether that is carpet, LVT, resilient, tile, or polished concrete, with substrate prep, underlayment, and moisture mitigation carried where the scope calls for it. Every line is labeled measured, derived, or assumed with a confidence and coverage score, so a light spot in the set is visible in the review instead of buried in a lump sum. Nothing goes out until your estimator signs it, and it all runs inside your own tenant on Bluebeam, Procore, Autodesk, and Excel, live in about a week.

Flooring numbers that hold up.

Judge it on your own flooring set, not a demo.
Built to work together.

See it on your own flooring set.
A free 30 minute walkthrough on a real flooring set, no card. We run the takeoff live and you decide if you move forward.
Proof and perspective.
Frequently asked questions
What flooring estimators ask before trusting an AI takeoff on a real set.
How accurate is the flooring takeoff?
Can Ruh run AI agents for flooring estimating?
Does it actually read our finish schedule and floor plans?
Can it price on our own flooring rates?
Does it fit the software we already run?
Can it give a quick budget number and a full bid?

Run your next floor on Ruh.
Send one flooring set. We run the takeoff and walk you through the floor area, the base, the transitions, and the substrate prep on a 30 minute call. If it does not hold up against your estimator, you have lost nothing.