100% money-backBook a walkthrough
For commercial HVAC contractors

HVAC estimating software. Duct, air devices, and equipment, priced on your numbers.

HVAC estimating software turns mechanical drawings into a priced HVAC bid: duct measured by system and size, diffusers, VAV boxes, RTUs, AHUs, and fans counted by tag against the schedules, and every line priced on your own price book and labor units. Below, watch a mechanical plan get measured and priced, see the reference table and our view on where HVAC bids slip, and get a free takeoff on your own set.

Measuring first? Mechanical Takeoff Software

Clients include

PCL Construction logoECC logoTaurus Builders logoAlliance Construction Solutions logo
Start with a free HVAC takeoff

Send the mechanical set for one job. The takeoff comes back free, run by run and tag by tag, ready to price.

No card. Your estimator decides what happens next.

What you get
  • ✓Duct by the foot for labor and by the pound for sheet metal
  • ✓Equipment and air devices counted by tag against the schedules
  • ✓No proposal until your estimator signs off the HVAC budget

Construction companies working with Ruh

  • pcl logo
  • ecc logo
  • taurus logo
  • alliance logo
  • dondlinger logo
  • spyder logo
  • comstock logo
  • limbach logo
  • adf logo
  • gldd logo
  • orion logo
  • argan logo
Quick answer

Can AI HVAC estimating software identify diffusers, grilles, and registers?

Yes. Ruh counts every diffuser, grille, and register by tag against the air device schedule, measures duct by system and size off the mechanical plans, and prices the lines through 17 starting HVAC recipes you can edit. The starting recipe for 24 in by 12 in duct in 24 gauge carries 8 lb of sheet metal per foot, so 100 LF of main is 800 lb before waste.

HVAC recipes to start from, yours to edit
17
of sheet metal in the starting recipe for 24 x 12 in, 24 gauge duct
8 lb/LF
on every device, the second one blind
2 counts
Watch it measure

What happens before an HVAC line is priced?

Ruh reads the mechanical plan against the equipment and air device schedules, runs the supply main and branches by size, counts every diffuser, grille, VAV box, and fan by tag, and works out the duct wrap from the main's length and size, so the quantities behind the bid can be checked run by run.

HVAC takeoff on a sample office fit-out plan. The counts and lengths are sample figures, not a customer job.
  1. 1

    The supply main and the spiral branches are measured by the foot, by system and size, and each run's gauge comes from the duct recipe you assign.

  2. 2

    Supply diffusers, return grilles, VAV boxes, the rooftop unit, and the exhaust fan are counted by tag against the equipment and air device schedules.

  3. 3

    Duct wrap is worked out from the main's length and perimeter and labeled as derived. The controls points wait: their scope is on a sheet that was not sent.

The problem

Where HVAC estimates come up short

HVAC estimates come up short between the plan and the schedule: duct that has to be priced by the foot and the pound, equipment tags that do not match the schedule, and controls scope nobody owns.

Ductwork by the pound vs by the foot

Sheet metal is bought by the pound and hung by the foot. A run measured in feet but never converted on the gauge leaves the material short, and a run priced only by weight leaves the hanging hours out.

Equipment schedules fight the plan tags

A VAV on the plan with no schedule entry, or a schedule line with no tag on the plan, is a unit priced twice or not at all. The counts have to agree before anything is priced.

Division 25 controls creep

Controls points, low-voltage wiring, and sequences sit between the mechanical, electrical, and controls contractors. Left unresolved, that scope lands in your number by default.

An estimator working from a drawing set and a laptop

Our view: An HVAC estimate should carry both numbers for every duct run, feet for the labor and pounds for the material, and show which schedule every unit was counted against. When it does, a reviewer can check a run in a minute instead of rebuilding the takeoff.

Reference

What an HVAC estimate is built from

An HVAC estimate, Division 23 of the spec, starts from the mechanical plans and schedules and builds the sheet metal, devices, and equipment from them. Every row lists the drawing behind a quantity and the price it carries.

LineWhere the quantity comes fromUnitWhat it is priced on
Rectangular ductDuct plan by system and size, gauge from your duct recipeLF and LBGalvanized sheet by the pound, hanging labor by the foot
Round and spiral ductDuct plan, by sizeLFDuct, fittings, hangers, labor
Duct insulation and wrapInsulated runs, from length and duct sizeSFWrap, tape, insulator labor
Diffusers, registers, and grillesAir device schedule and ceiling plansEADevice, flex, labor per device
VAV boxes and terminal unitsEquipment schedule, counted by tagEAUnit, hangers, connection labor
RTUs, AHUs, and fansEquipment schedule, counted by tagEASupplier quote, curb, rigging, crane time
Refrigerant and hydronic pipingPiping plans, by size and materialLFPipe, insulation, labor
Controls pointsControls drawings and Division 25EAYour controls subcontractor or your own rates

Typical practice, not a standard. In Ruh, equipment is counted by tag, duct is measured by system and size, and every rate comes from your price files, rate book, and quotes.

A worked HVAC estimate

A small single-floor tenant fit-out. Off the mechanical schedules and plans, the takeoff lands at 6 RTUs, 18 VAV boxes, 64 diffusers and grilles, 4,200 lb of galvanized duct converted from feet through the duct recipes, and 1,800 SF of duct insulation.

Illustrative rates. In Ruh every rate comes from your own price files, and every quantity traces to a counted tag or a measured run.

  1. 1
    Rooftop units
    6 x $11,500 set, connected, and started = $69,000
  2. 2
    Galvanized duct
    4,200 lb x $14.50 per lb, fabricated and installed = $60,900
  3. 3
    VAV boxes
    18 x $1,350 set and connected = $24,300
  4. 4
    Diffusers and grilles
    64 x $185 = $11,840
  5. 5
    Duct insulation
    1,800 SF x $4.25 = $7,650
Bare cost: $173,690 before markup, controls, and general conditions
Watch it price

How does an HVAC takeoff become a priced bid?

The measured duct and counted devices land in a budget grouped by trade. Each line prices from your rate book, a price file, or a supplier quote, the rooftop unit waits for its equipment quote, and the source stays on every line as it rolls up to the proposed bid.

  • ✓

    Equipment by supplier quote

    Rooftop units and other scheduled equipment price from the supplier quote you enter, and the line keeps that quote as its source.

  • ✓

    Duct by the foot and the pound

    A duct run's assembly carries the sheet metal by the pound and the hanging hours by the foot, with the factor shown on each line.

  • ✓

    Markups you set

    Margin, overhead, fee, and contingency are yours and roll up to the proposed bid, with a unit rate on the measured quantity.

  • ✓

    Approval comes before the proposal

    No proposal is built until your estimator approves the HVAC budget.

HVAC budget on sample figures. The rooftop unit quote is keyed in by hand, as an estimator would.
How it works

From mechanical drawings to a priced HVAC bid in three steps

  1. 1

    Send the drawings

    Mechanical plans, equipment and air device schedules, duct and piping details, the Division 23 spec, and any equipment quotes already in hand, as PDF or CAD.

  2. 2

    Ruh measures and prices

    Duct is measured by system and size, devices and equipment counted by tag, the counts checked against the schedules, and every line priced on your files with its source shown.

  3. 3

    Your estimator approves it

    Settle the flagged lines, enter the open quotes, adjust a factor or a markup, and approve. Duct, device, and equipment lines export, and the proposal is drawn from the approved budget.

A contractor and a subcontractor reviewing a drawing set together on a jobsite
Free takeoff

Price your next HVAC bid from a free takeoff.

Send one mechanical set. We return the takeoff at no cost so you can price it on your own numbers and see the duct, devices, and equipment laid out run by run and tag by tag.

Your own drawings No card Your price book stays yours
From a customer

In a customer's own words

“Our estimators spent more time retyping quantities than thinking about scope. Ruh reads our drawings like a senior estimator and hands back a priced estimate we want to review, not rebuild.”
Director of Preconstruction, ADF GroupDirector of PreconstructionADF Group
faster bid turnaround
~50%
ADF Group, structural steel
on every takeoff, the second one blind
2 counts
Checks tab, before anything is priced
tied to the sheet it came from
Every line
Takeoff and price sheet
FAQs

HVAC estimating software FAQs

What HVAC contractors ask before pricing a real bid with AI.

What is HVAC estimating software?

HVAC estimating software prices a mechanical bid from the drawings: duct measured by system and size, air devices and equipment counted by tag, piping and insulation measured, then labor, equipment quotes, and markup. Ruh runs the HVAC takeoff from your mechanical set and prices every line on your own price book, for commercial HVAC contractors and mechanical subcontractors.

Bring one mechanical job. Check the counts yourself.

One mechanical set, a free takeoff, and a 30-minute walk through the duct, devices, equipment, and the budget they price into. If the counts do not hold up against yours, it cost you nothing.

Free takeoff No card 30-minute walkthrough
Start with a free HVAC takeoff

No card. Your estimator decides what happens next.