Masonry estimating software. CMU and brick, measured and priced on your numbers.

Masonry estimating software turns CMU and brick drawings into a priced bid for commercial block and brick scopes: walls measured by wall type with openings deducted, bond beams and control joints run by the foot, lintels counted, and every line priced on your own price files. Below, watch an elevation get measured, see a masonry budget priced and approved, and get a free takeoff on your own set.

Measuring first? Masonry Takeoff Software

Clients include

PCL Construction logoECC logoTaurus Builders logoAlliance Construction Solutions logo
Start with a free masonry takeoff

Send the elevations and wall types for one job. The takeoff comes back free, wall by wall, ready to price.

No card. Your estimator decides what happens next.

What you get
  • ✓Walls measured by assembly, openings deducted
  • ✓Block, grout, and reinforcing carried by the assembly
  • ✓Your estimator approves the budget before any proposal

Construction companies working with Ruh

  • pcl logo
  • ecc logo
  • taurus logo
  • alliance logo
  • dondlinger logo
  • spyder logo
  • comstock logo
  • limbach logo
  • adf logo
  • gldd logo
  • orion logo
  • argan logo
Quick answer

Is there masonry estimating software for CMU and brick?

Yes. Ruh measures every CMU and brick wall by type with the openings deducted, then prices block, grout, and reinforcing on your own price files through 12 starting masonry recipes you can edit. 8x16 block runs 1.125 units per square foot, so a 100 LF wall 12 ft high is 1,200 SF and 1,350 block before waste.

8x16 block per square foot of wall
1.125
masonry recipes to start from, yours to edit
12
in a 100 LF wall, 12 ft high, before waste
1,350 block
Watch it measure

What happens before a masonry line is priced?

Ruh reads the elevations against the wall types, measures each wall by its assembly with the openings deducted, runs bond beams and control joints by the foot, and counts the lintel over every opening, so the block count behind the bid can be checked wall by wall.

Masonry takeoff on a sample north elevation. The areas and counts are sample figures, not a customer job.
  1. 1

    CMU and brick veneer are measured by wall type, and every door and window opening is deducted explicitly.

  2. 2

    Bond beams and control joints are run by the foot, and lintels are counted per opening, apart from the wall area.

  3. 3

    Each wall area and run becomes a line in the masonry budget, still linked to the elevation it was measured on.

The problem

Where masonry estimates come up short

Masonry estimates come up short in the conversions: square feet of wall into block and brick, cell spacing into grout, and wall height into reinforcing and scaffold.

Unit counts depend on unit size and waste

A square foot of 8x16 block is 1.125 units with a 3/8 in joint, and brick runs at its own rate per square foot. Use the wrong unit size or skip the waste and the order is short before the first course.

Grout hides in the cell spacing

Grout volume swings with the spacing the drawings call for: an 8 in wall grouted at 48 in uses a fraction of the grout of the same wall grouted solid. Priced as one rate, the difference comes off your margin.

Reinforcing and access get left behind

Vertical bars, joint reinforcement, lintels, and scaffold are separate lines with separate costs. Folded into a wall rate, they are the first things missed on a fast takeoff.

A contractor and a subcontractor reviewing a drawing set together on a jobsite

Our view: A masonry estimate should show its math. When the block count, grout, and bars sit next to the wall area they came from, a reviewer can check a wall in a minute instead of rebuilding the takeoff to trust it.

Reference

What a masonry estimate is built from

A masonry estimate, Division 04 of the spec, starts from wall area by wall type and builds everything else from it. Each row shows the drawing a quantity is taken from and what the line is priced on.

LineWhere the quantity comes fromUnitWhat it is priced on
Wall area by wall typeElevations and wall types, openings deductedSFThe wall assembly on your price files
CMU block, 8x16Wall area at 1.125 units per SF plus wasteEAUnit price per block and your mason labor
Brick veneerVeneer area, openings deductedSFBrick from your supplier quote, laying labor per SF
GroutWall area by the grouted cell spacingCYGrout price and placing labor
MortarWall area by unit typeCFMortar mix per bag or yard
Joint reinforcement and barsCourses and the called bar spacingLFReinforcing material and setting labor
Bond beams and control jointsElevations and masonry notesLFAssembly price per foot
LintelsOne per opening, from the lintel scheduleEALintel price and setting labor
ScaffoldWall height and durationDAYYour equipment rates

Factors follow the assembly, and each rate comes from your company price files, rate book, and quotes. The worked example uses illustrative rates, not benchmarks.

A worked CMU wall estimate

One detailed CMU wall, 100 LF long and 12 ft high, 8x8x16 block grouted at 48 in on center.

Illustrative rates. In Ruh every rate comes from your own price files, and the factors come from the wall's assembly.

  1. 1
    Wall area
    100 LF x 12 ft = 1,200 SF
  2. 2
    Block
    1,200 SF x 1.125 = 1,350, plus 5 percent waste = about 1,420 block x $5.50 installed = $7,810
  3. 3
    Grout at 48 in on center
    about 3 CY with waste x $280 installed = $840
  4. 4
    Vertical #5 bars
    about 0.16 tons x $2,650 = $424
  5. 5
    Joint reinforcement, every other course
    9 layers x 100 LF = 900 LF x $0.55 = $495
  6. 6
    Frame scaffold
    1,200 SF of face x $1.75 = $2,100
Wall total: $11,669, about $9.72 per SF
Watch it price

How does a masonry takeoff become a priced bid?

The wall areas and runs land in a budget grouped by trade. Block, grout, and reinforcing come through the wall's assembly, each line prices from your rate book, a price file, or a supplier quote, and the source stays on the line as it rolls up to the proposed bid.

  • ✓

    Assemblies carry the factors

    A wall type expands into its block, mortar, grout, and reinforcing, with the factor shown on each line.

  • ✓

    Supplier quotes stay quotes

    The brick line waits unpriced until the supplier quote is entered, and keeps that quote as its source.

  • ✓

    Markups you set

    Margin, overhead, fee, and contingency are yours and roll up to the proposed bid and a cost per square foot of wall.

  • ✓

    Approval comes before the proposal

    No proposal is built until your estimator approves the masonry budget.

Masonry budget on sample figures. The brick quote is keyed in by hand, as an estimator would.
How it works

From elevations to a priced masonry bid in three steps

  1. 1

    Send the drawings

    Elevations, wall types and sections, the lintel schedule, masonry notes, and any supplier quotes already in hand, as PDF or CAD.

  2. 2

    Ruh measures and prices

    Walls are measured by assembly with openings deducted, runs and lintels taken off, and every line priced on your files with its source shown.

  3. 3

    Your estimator approves it

    Enter the open quotes, adjust a factor or a markup, and approve. Wall quantities and priced lines export, and the bid you send is built from the approved budget.

Aerial view of a crew working on an active construction site
Free takeoff

Price your next masonry bid from a free takeoff.

Send one set of elevations and wall types. We return the takeoff at no cost so you can price it on your own numbers and see the block, grout, and reinforcing laid out wall by wall.

Your own drawings No card Your price book stays yours
From a customer

In a customer's own words

“Our estimators spent more time retyping quantities than thinking about scope. Ruh reads our drawings like a senior estimator and hands back a priced estimate we want to review, not rebuild.”
Director of Preconstruction, ADF GroupDirector of PreconstructionADF Group
faster bid turnaround
~50%
ADF Group, structural steel
on every takeoff, the second one blind
2 counts
Checks tab, before anything is priced
tied to the sheet it came from
Every line
Takeoff and price sheet
FAQs

Masonry estimating software FAQs

What masonry contractors ask before pricing a real bid with AI.

What is masonry estimating software?

Masonry estimating software is the tool that prices a masonry bid from the drawings: wall area by wall type, block and brick counts at the right unit size and waste, grout and reinforcing from the assembly, then labor, scaffold, and markup. Ruh runs the masonry takeoff from your elevations and prices every line on your own price files.

Bring one masonry job. Check the math yourself.

One set of elevations, a free takeoff, and a 30-minute walk through the walls, the openings, and the budget they price into. If the block count does not hold up against yours, it cost you nothing.

Free takeoff No card 30-minute walkthrough
Start with a free masonry takeoff

No card. Your estimator decides what happens next.