What is clearing and grubbingin construction?

Clearing and grubbing in construction is the first sitework operation on a raw site: clearing removes trees, brush, and vegetation above the ground, and grubbing digs out the stumps, roots, and buried organic matter below it. The work is measured by the acre within the limits of disturbance and ends with the debris chipped, hauled off, or otherwise disposed of per the specs. It clears the way for topsoil stripping and mass grading.

Free 30-minute walkthrough on your own drawings. No card.

Updated June 2026 · Reviewed by the Ruh construction team

Measured in acres (LOD)Acre conversion 1 ac = 43,560 sfLives in Division 31 specPermit trigger 1+ ac = SWPPP

How clearing and grubbing cost splits

The definition

Clearing and grubbing, explained.

Clearing and grubbing shows up on the civil existing conditions and demolition sheets, with the limits of disturbance line defining the boundary, a tree survey or tree protection plan flagging what stays, and the requirements written in the Division 31 site clearing spec. The sitework contractor owns the scope, sometimes subbing heavy timber to a specialty land clearing outfit running forestry mulchers. Clearing and grubbing are two operations with two cost profiles: clearing is fast, grubbing is slow, because every stump comes out of the ground and leaves a hole that has to be backfilled and compacted. New estimators make three predictable mistakes: pricing by the acre off an aerial photo without judging density (a per-acre rate for light brush is a fraction of the rate for mature hardwood), assuming debris can be burned or buried on site when the spec or local rules require haul-off, and forgetting that protected trees inside the limits need fencing and root zone protection, which slows the machines down. Disposal distance and tipping fees can rival the cutting cost.

How it is measured

The base quantity is acres (or square feet on small sites) inside the limits of disturbance, taken from the civil plans; 1 acre is 43,560 sf. Most estimators split the area by density class, such as heavy timber, light woods, and brush, and carry a different per-acre rate for each. Large specimen trees are often counted by the each on top of the acreage rate, and haul-off is measured in truckloads or tons with disposal fees attached. Cost drivers: vegetation density, stump diameter, whether on-site chipping or grinding is allowed, haul distance, and wet ground that limits equipment. One regulatory tie-in: land disturbance of 1 acre or more generally triggers NPDES stormwater permitting and a SWPPP, so erosion controls go in before the dozers start.

Worked example

A worked clearing and grubbing example.

Worked example

Heavy clearing (illustrative)4.2 x $9,500 = $39,900
Light brush (illustrative)2.3 x $3,200 = $7,360
Debris haul (illustrative)55 x $325 = $17,875
Total (illustrative)$39,900 + $7,360 + $17,875 = $65,135
How Ruh handles it

How Ruh handles clearing and grubbing.

100%

Try Ruh on a real bid. 100% money-back guarantee if you are not satisfied.*

*Scoped delivery, terms apply. Read the guarantee terms

Start with a walkthrough

Clearing and grubbing: frequently asked questions

What is the difference between clearing and grubbing?+

Clearing is the removal of everything above the ground surface: trees, brush, vegetation, and downed timber. Grubbing is the removal of what is below it: stumps, root mats, and buried organic debris, typically to a depth stated in the spec. They are bid together because the same equipment and limits apply, but grubbing is the slower, more expensive half, and the stump holes it leaves must be backfilled and compacted before grading starts.

How much does clearing and grubbing cost per acre?+

There is no single rate, because density drives everything: light brush might run a few thousand dollars per acre while dense mature timber with full haul-off can run several times that. The honest approach is to classify the site into density bands, price each band from your own history, and carry disposal as its own line tied to haul distance and tipping fees. Timber with merchantable value can sometimes offset part of the cost.

Does clearing and grubbing include topsoil stripping?+

Usually not. Clearing and grubbing removes vegetation and roots; topsoil stripping is a separate grading operation that follows it, measured in cubic yards and often stockpiled for reuse. The Division 31 specs typically separate the two, and so should the estimate. Also confirm whether stump hole backfill and compaction sits in the clearing line or the earthwork line, so it is carried once and not missed in both.

Still measuring by hand? Your next takeoff can run while you review this one.

See it on your plans

Related terms

Keep going: read the full guide or explore AI construction takeoff and estimating software.

The Sitework estimating cheat sheet
Every unit, waste factor, and conversion on one page. Free PDF.

Figures on this page are illustrative. Construction estimates depend on project-specific conditions, source documents, market pricing, and professional judgment. Ruh's AI assists the estimator and does not replace professional review: your team reviews, validates, and approves every estimate, bid, and pricing decision.

100% money-back guarantee

Try Ruh on a bid you are pricing now.

Put your next takeoff on Ruh.