HSS (hollow structural section): frequently asked questions
Why does HSS cost more per pound than wide flange?+
Tube is formed and seam welded from coil rather than hot rolled as an open shape, and fewer mills produce it, so the material itself carries a premium over W shapes. Fabrication adds to the gap: you cannot bolt through a closed section easily, so connections lean on welding, through plates, and cap plates, which means more shop labor per pound. Carry HSS on its own unit rate rather than blending it into the wide flange tonnage.
What does AESS mean for an HSS takeoff?+
AESS is architecturally exposed structural steel: the spec assigns a finish category that can require ground and filled weld seams, eased corners, continuous welds where stitch welds would otherwise do, and a paint grade surface. Exposed HSS at canopies and lobbies is a common AESS target, and the premium over plain shop primer is significant. Take off exposed members as separate line items so the finish cost stays visible.
How do I read a designation like HSS6x6x3/8?+
The first two numbers are the outside dimensions in inches (6 in by 6 in square here) and the last is the nominal wall thickness (3/8 in); round HSS is called out as outside diameter by wall, like HSS6.625x0.280. For takeoff, pull the weight per foot from the AISC tables for that exact designation. The design wall thickness reduction on A500 tube matters to the engineer sizing the member, not to the weight you carry in the estimate.
Still measuring by hand? Your next takeoff can run while you review this one.
See it on your plansRelated terms
Keep going: read the full guide or explore structural steel estimating software.
Figures on this page are illustrative. Construction estimates depend on project-specific conditions, source documents, market pricing, and professional judgment. Ruh's AI assists the estimator and does not replace professional review: your team reviews, validates, and approves every estimate, bid, and pricing decision.