What is construction manager at risk (CMAR)?

Construction manager at risk is a delivery method where the owner hires a builder during design to advise on cost and constructability, and that builder later commits to a guaranteed maximum price and holds the trade contracts. Below that: CM at risk against CM agency, a GMP built line by line, our view, and a link to the free method comparison.

Free 30-minute walkthrough on your own drawings. No card.

Updated November 2026 · Reviewed by the Ruh construction team

The definition

Construction Manager at Risk, Explained.

The owner still hires its own designer, but brings in the construction manager early, often at schematic design. During preconstruction the CM prices the design as it develops, suggests cheaper ways to meet it and plans the sequence.

When the design is far enough along, the CM commits to a guaranteed maximum price and takes on the risk of building within it, which is the at risk in the name. The AIA's A133 is a common agreement for it.

Check CM at risk against design-build and design-bid-build in the free project delivery method comparison.

How it is measured

CM at risk is measured against the guaranteed maximum price: the estimated cost of the work, contingency, general conditions and the CM's fee. Costs above it are the CM's to carry, and savings under it go back as the contract says.

CM at Risk vs CM Agency

A CM agency advises the owner for a fee and holds no trade contracts or price risk. A CM at risk holds the trade contracts and guarantees the price.

The price CMAR commits to is a guaranteed maximum price, built from preconstruction estimates.

Our View

In our view, CM at risk is won in preconstruction. An owner keeps the CM whose estimate at each design release lands close to the bids that follow, and drops the one that surprises it.

Worked example

A Worked GMP Build-Up

Illustrative example. A CM sets its guaranteed maximum price at design development.

Cost of work $8,400,000, contingency $252,000, general conditions $640,000 and a 4% fee of $371,680 make a $9,663,680 GMP.

LineWorkingAmount
Estimated cost of the workTrade bids and self-perform$8,400,000
CM contingency3% x $8,400,000$252,000
General conditionsTime-based costs$640,000
Fee4% x $9,292,000$371,680
Guaranteed maximum price$9,663,680

If the final cost of the work plus fee comes to $9,480,000, the $183,680 under the GMP goes back to the owner or is shared, as the contract sets out.

Illustrative figures, not a customer job.

How Ruh handles it

How Ruh Handles Construction Manager at Risk.

Try Ruh on a real bid.

Start with a walkthrough

Construction Manager at Risk: Frequently Asked Questions

What is construction manager at risk?+

The owner brings a builder onto the team while design is still going, and that builder later guarantees the price and holds the trade contracts.

What is the difference between CM at risk and design-build?+

Under CM at risk the owner keeps a separate contract with its designer. Under design-build one contract covers both design and construction.

When is the GMP set?+

Usually when the design is far enough along to price, often at design development or partway through construction documents.

What does CM/GC mean?+

It is another name for construction manager at risk, used by some public owners, especially transportation agencies.

Still measuring by hand? Your next takeoff can run while you review this one.

See it on your plans

Related Terms

Keep going: A Worked GMP Build-Up, the free project delivery method comparison or explore General Contractor Software.

The Construction Estimating Cheat Sheet
Every unit, waste factor, and conversion on one page. Free PDF.

Figures on this page are illustrative. Construction estimates depend on project-specific conditions, source documents, market pricing, and professional judgment. Ruh's AI assists the estimator and does not replace professional review: your team reviews, validates, and approves every estimate, bid, and pricing decision.

Try Ruh on a Bid You Are Pricing Now.

Put Your Next Takeoff on Ruh.