What is a bid bond?

A bid bond is a surety's guarantee that a bidder who wins will sign the contract and provide the performance and payment bonds the bid documents ask for. Read on for how the owner sets the amount, what a claim pays when a low bidder walks, our view, and a link to a free calculator for penal sums.

Free 30-minute walkthrough on your own drawings. No card.

Updated November 2026 · Reviewed by the Ruh construction team

The definition

Bid Bond, Explained.

The owner sets the bid bond as a percentage of the bid, and the bidder submits it with its price. If the low bidder refuses to sign or cannot provide the required bonds, the owner can claim against the bid bond.

On federal work the bid guarantee must be at least 20 percent of the bid price and not more than $3 million (FAR 28.101-2). State, local and private owners set their own percentage, often lower.

To work out a bid bond's penal sum, use the free construction bond cost calculator.

How it is measured

A bid bond is measured as a percentage of the bid price, set in the bid documents, which gives the penal sum. On federal work it is at least 20 percent with a $3 million cap.

What a Bid Bond Claim Pays

Under many bid bond forms the surety pays the smaller of the penal sum and the owner's loss, usually the difference between the defaulting bid and the bid the owner accepts instead. Read the form the owner requires, because some pay the full penal sum as liquidated damages. Many states also let a bidder withdraw over a clerical mistake without forfeiting the bond. This is typical practice, not legal advice.

Once the contract is signed, the performance bond takes over.

Our View

In our view, a bid bond turns a mistake in the number into a cost you cannot walk away from. Check the takeoff and the bid form before you bond the price, not after the bids are opened.

Worked example

A Worked Bid Bond Example

Illustrative example. A state job asks for a 10 percent bid bond. The low bid is $1,840,000 and the next bid is $1,905,000. The low bidder withdraws, and the owner can enforce the bond.

A 10% bid bond on a $1,840,000 bid is $184,000. If that bidder withdraws and the owner takes the $1,905,000 bid, the claim is the $65,000 difference.

StepAmount
Bid bond penal sum, 10% of the low bid10% x $1,840,000 = $184,000
Owner awards to the next bidder$1,905,000
Owner's loss$1,905,000 - $1,840,000 = $65,000
Claim under a smaller-of form$65,000

On federal work the same bid would need a bid guarantee of at least $368,000, 20 percent of the bid.

Illustrative numbers only, not a ruling on any real claim.

How Ruh handles it

How Ruh Handles Bid Bond.

Try Ruh on a real bid.

Start with a walkthrough

Bid Bond: Frequently Asked Questions

What is a bid bond?+

A surety's guarantee that a winning bidder will sign the contract and provide the required performance and payment bonds.

How much is a bid bond on federal work?+

FAR 28.101-2 sets it at no less than 20 percent of the bid, capped at $3 million.

What happens if the low bidder withdraws?+

The owner can claim against the bid bond. Under many forms the claim is the smaller of the penal sum and the difference between the withdrawn bid and the bid the owner accepts.

Is a bid bond the same as a performance bond?+

No. A bid bond covers the period from bid to contract. A performance bond covers the work itself once the contract is signed.

Still measuring by hand? Your next takeoff can run while you review this one.

See it on your plans

Related Terms

Keep going: A Worked Bid Bond Example, the free construction bond cost calculator or explore General Contractor Software.

The Construction Estimating Cheat Sheet
Every unit, waste factor, and conversion on one page. Free PDF.

Figures on this page are illustrative. Construction estimates depend on project-specific conditions, source documents, market pricing, and professional judgment. Ruh's AI assists the estimator and does not replace professional review: your team reviews, validates, and approves every estimate, bid, and pricing decision.

Try Ruh on a Bid You Are Pricing Now.

Put Your Next Takeoff on Ruh.