Free construction template
Construction Bid Proposal Template
A construction bid proposal is a contractor's priced offer to build a project: the base bid, any alternates and unit prices, and the inclusions, exclusions and terms the price depends on. On this page: a free Excel bid proposal, a table of its parts, a worked example with alternates, and our view on writing exclusions.

What is in the workbook
- Owner, project, bid date and every addendum received, by number and date
- Base bid, then alternates as adds or deducts with an accepted column that sets the proposed contract sum
- Unit prices, and the allowances carried inside the base bid with their total
- Inclusions, exclusions, qualifications, duration, how long the price holds and a signature block
Bidding this job now? Get the takeoff behind the base bid, free.
Send one set of drawings from a job you are bidding and we take it off free, every quantity tied to the sheet it came from.
What a construction bid proposal includes
A proposal answers two questions for the owner: what the price is, and exactly what it buys. Each part below closes off a way for the two to be read differently later.
| Part | What it states |
|---|---|
| Base bid | The price for the work in the documents, as revised by every addendum |
| Alternates | Priced options the owner can add or deduct when awarding |
| Unit prices | Rates for work whose quantity may change, such as extra doors |
| Allowances | Sums carried in the base bid for items not yet selected |
| Inclusions and exclusions | Where the scope starts and stops, line by line |
| Schedule and validity | Duration from notice to proceed, and how long the price holds |
Typical practice, not legal advice. The owner's instructions to bidders can require other parts.
A worked bid proposal example
The illustrative office build-out from the construction estimate template carries a base bid of $933,376.50. The owner accepts polished concrete in the corridors, an add of $14,200, and deletes the window film, a deduct of $6,800. The lighting control upgrade, an add of $22,500, is not accepted.
| Line | How it is figured | Amount |
|---|---|---|
| Base bid | From the estimate | $933,376.50 |
| Accepted alternates, net | $14,200 add less $6,800 deduct | $7,400.00 |
| Allowances inside the base bid | Signage $15,000 + data cabling $28,000 | $43,000.00 |
| Proposed contract sum | $933,376.50 + $7,400.00 | $940,776.50 |
Bid on November 6, 2026 with a 60-day hold, the price is good through January 5, 2027.
Alternates, unit prices and allowances
These three are easy to confuse and costly to mix up. The allowance glossary entry covers how allowances are reconciled.
| Item | What it is | When the owner uses it |
|---|---|---|
| Alternate | A priced option to add or deduct | At award |
| Unit price | A rate per unit of work | When quantities change during the job |
| Allowance | A sum inside the base bid for an item not yet chosen | Reconciled to actual cost once chosen |
Inclusions, exclusions and qualifications
Disputes over a bid often come down to scope. List inclusions by sheet and specification section, list every exclusion by name, and state the assumptions the price depends on, such as normal working hours or elevator access. The free scope of work template builds the same lines trade by trade, and the scope of work glossary entry explains how scope gaps form.
Before you submit
- Acknowledge every addendum by number and date.
- Use the owner's bid form if one was issued, and attach this proposal only if the instructions allow it.
- Include the bid bond if the instructions require one.
- Check that the alternates, unit prices and allowances match the bid form's list exactly.
- Sign it, and state how long the price holds.
Our view: write the exclusions as carefully as the price
In our view, the exclusions list is the part of a proposal that saves the most trouble later. Write it from the drawings and specifications, line by line, before you settle the number, because a price is only as firm as the scope it names.
Construction bid proposal FAQs
What is a construction bid proposal?+
A construction bid proposal is a contractor's priced offer to build a project. It states the base bid, alternates, unit prices and allowances, and the inclusions, exclusions and terms the price depends on.
What is the difference between a bid and a proposal?+
In practice, little. A bid usually answers a formal invitation with a set form and a deadline, and a proposal is the contractor's own document. Many owners use the words for the same thing.
What is a bid alternate?+
A bid alternate is a priced option in the bid documents that the owner can accept or reject at award, either an add to the base bid or a deduct from it.
What should a bid proposal exclude?+
Anything the documents could be read to include but your price does not cover, named one by one. Common exclusions are owner-furnished equipment, hazardous material abatement and permits paid by the owner.
How long is a construction bid valid?+
As long as the proposal or the owner's instructions say. State the holding period in days and the date it ends, so the price cannot be read as open-ended.
Is the bid proposal template free?+
Yes. A work email unlocks the workbook, and it is yours for every bid after this one.
This template is a proposal summary, not a contract or legal advice. The owner's bid form and the agreement you sign govern.