What are girders in construction?

Girders are the primary horizontal members in a steel frame that carry other beams: infill beams frame into the girders, and the girders frame into the columns. Estimators take girders off by member from the framing plans, multiplying the weight per foot in the shape callout (a W24x76 weighs 76 lb per foot) by the member length, then converting total pounds to tons for pricing.

Free 30-minute walkthrough on your own drawings. No card.

Updated August 2026 · Reviewed by the Ruh construction team

Carries other beamsHeavier than a typical beamPriced by steel tonnage
The definition

Girder, explained.

A girder is the primary horizontal member in a structural steel frame: beams frame into girders, and girders frame into columns. On commercial jobs the girders show up on the structural framing plans (the S2xx series in most sets) with a callout like W24x76, where W means wide flange, 24 is the nominal depth in inches, and 76 is the weight in pounds per linear foot. The steel fabricator details girders on shop drawings, the erector sets them in the field, and the GC's or steel sub's estimator takes them off by member during bidding. New estimators trip over a few predictable things: confusing girders with the beams that load them (both look identical in section, the hierarchy lives in the plan), missing the connection material and stiffeners that ride along with girders at moment frames, and reading the span as the grid dimension when the actual member length is grid minus the column depth and setbacks. Because girders are heavy relative to infill beams, a missed or double-counted girder line moves the tonnage, and the bid, more than almost any other single member.

How it is measured

Girders are taken off by member from the structural framing plans, cross-checked against the beam schedule and the column grid. The takeoff unit is weight: pounds per linear foot from the shape designation times the member length in feet, summed and divided by 2,000 to get tons. Fabrication and erection are both priced per ton, so the estimate carries girders inside the structural steel tonnage line rather than as a separate trade. Convention is to add a connection allowance, commonly somewhere around 8 to 12 percent of net member weight, to cover clip angles, plates, and bolts that the plans do not quantify, and to round the final tonnage up to two decimals or the nearest tenth. Quantities should tie back to the AISC shape weights, not scaled guesses.

Worked example

Taking girders off by weight per foot

Worked example

Take a one-story office floor with 8 interior girders, all W24x76, each spanning 32 ft column to column. Step 1, weight per girder: 76 lb per ft x 32 ft = 2,432 lb. Step 2, total weight: 8 girders x 2,432 lb = 19,456 lb. Step 3, convert to tons: 19,456 lb divided by 2,000 lb per ton = 9.728 tons, carried as 9.73 tons. Step 4, price it: at an illustrative $2,800 per ton for fabrication plus $900 per ton for erection, the combined rate is $3,700 per ton, so 9.73 tons x $3,700 = $36,001 for the girder package before connections, deck, and fireproofing. Connection material is usually carried as a percentage allowance on top, often around 10 percent of member weight, which would add roughly 0.97 tons here.

How Ruh handles it

How Ruh handles girder.

100%

Try Ruh on a real bid. 100% money-back guarantee if you are not satisfied.*

*Scoped delivery, terms apply. Read the guarantee terms

Start with a walkthrough

Girder: frequently asked questions

What are girders in construction?+

Girders are the primary horizontal members of a steel frame, the ones the other beams land on. Infill beams frame into the girders and deliver their load to them, and the girders carry it down to the columns, which is why a girder line that is missed or double-counted moves the tonnage more than almost any other single member. For the estimator they are a weight line: pounds per foot from the shape callout times the member length, summed and divided by 2,000 for tons.

What is the difference between a girder and a beam?+

Both are horizontal members, and in steel they are often the same wide flange shapes. The difference is hierarchy: beams carry the deck or joists and deliver their load to girders, while girders carry those beams and deliver the load to columns. On a framing plan the girders run along the column lines and the infill beams frame into their webs, which is why girders are typically the heavier shapes in any bay.

How do I figure the weight of a girder from its callout?+

The shape designation gives it to you directly. A W24x76 is a wide flange, nominally 24 inches deep, weighing 76 lb per linear foot, so a 30 ft piece weighs 30 x 76 = 2,280 lb. Multiply weight per foot by length for each member, sum the pounds, and divide by 2,000 to get the tons that fabrication and erection are priced on.

Do girder quantities include connections and stiffeners?+

Not from the shape weight alone. The per-foot weight covers only the rolled member, so estimators add a connection allowance, commonly in the range of 8 to 12 percent of net weight depending on the connection types, to cover clips, plates, bolts, and stiffeners. Moment connections and heavy gusset work push that allowance higher, which is one reason two bids on the same plans can show different tonnages.

Still measuring by hand? Your next takeoff can run while you review this one.

See it on your plans

Related terms

Keep going: Taking girders off by weight per foot, read the full guide or explore structural steel estimating software.

The Steel and structural estimating cheat sheet
Every unit, waste factor, and conversion on one page. Free PDF.

Figures on this page are illustrative. Construction estimates depend on project-specific conditions, source documents, market pricing, and professional judgment. Ruh's AI assists the estimator and does not replace professional review: your team reviews, validates, and approves every estimate, bid, and pricing decision.

100% money-back guarantee

Try Ruh on a bid you are pricing now.

Put your next takeoff on Ruh.