Window sill: frequently asked questions
Should I take window sills off the schedule or the elevations?+
Start from the window schedule for an accurate count and rough opening widths by mark, then verify the sill detail in the wall section for material, slope, and end dams. Elevations confirm location but the schedule drives the quantity.
Why carry both a count and linear feet for sills?+
Because pricing splits two ways. Precast and stone sills often price each by size, while extruded metal and slab sills price by the foot. Labor usually tracks the count of openings, so you need both numbers.
What do I add to the bare opening width when figuring sill stock?+
End-dam returns on each end and a cutting or miter allowance. The drip and the turn-ups at the jambs consume stock beyond the net rough opening, so the ordered footage runs longer than the sum of widths.
Still measuring by hand? Your next takeoff can run while you review this one.
See it on your plansRelated terms
Keep going: read the full guide or explore glazing estimating software.
Figures on this page are illustrative. Construction estimates depend on project-specific conditions, source documents, market pricing, and professional judgment. Ruh's AI assists the estimator and does not replace professional review: your team reviews, validates, and approves every estimate, bid, and pricing decision.