EstimatingExplore estimating
For plumbing supply houses

Plumbing takeoff for supply houses. Fixtures counted, pipe measured by size.

Plumbing takeoff for supply houses turns a contractor's plumbing plans into the material a counter quotes: fixtures by tag with their trim and rough-in, water and waste pipe by material and size, and the fittings, hangers and joining materials that go with every foot. On this page: the plumbing recipes in a calculator you can run, a table of what a plumbing order holds, our take on fittings, and a CSV of the recipes.

Try the order-list calculator

Clients include

PCL Construction logoECC logoTaurus Builders logoAlliance Construction Solutions logo
Get a free plumbing takeoff

Send a plumbing set from a contractor. We send back the material list, free.

No card. The counter makes every pricing call.

What you get
  • ✓Fixtures counted by tag against the schedule
  • ✓Pipe by system and size, with fittings and hangers
  • ✓Your counter's price list first, PDF or CSV out
Quick answer

Can a plumbing supply house get a material list from the plans?

Yes. Ruh counts fixtures and equipment by tag, measures water, waste and gas pipe by system and size, and turns each into its material lines: the fixture or its trim, the rough-in pipe and fittings, hangers, and solder or cement, plus waste wherever a recipe applies one. You start from 30 plumbing recipes, all editable, and we run your first set for free.

plumbing recipes to start from, yours to edit
30
material lines behind those 30 recipes
168
one plumbing set taken off at no cost
1st takeoff free
Try it

How many fittings does a run of copper need?

The app's starting recipe for 3/4 inch type L copper carries 0.4 fittings and about 0.17 hangers per foot of pipe, plus solder. Enter a fixture count or a pipe run to see each line it brings, as quantities only.

A plumber tightening a brass fitting on a pipe run

1. Pick a starting recipe

Water closet, floor-mount, flush valve, with rough-in

each
3. Read the order list

Order list for 12 each of Water closet, floor-mount. A sample input: change it to the quantity on your set.

Materials for 12 each of Water closet, floor-mount, flush valve, with rough-in
MaterialQuantityWith waste
Water closet, floor-mount, elongated (by supplier quote)Priced by your quote
How it is builtPriced from the fixture package quote
12 EA12 EA
Flush valve, manual, 1.28 gpf12 EA12 EA
Seat, open front12 EA12 EA
Wax ring and closet bolts12 EA12 EA
PVC DWV pipe 3"
How it is builtStub to the branch
120 LF126 LF, incl. 5% waste
PVC DWV fittings 3"48 EA48 EA
Copper type L 1"96 LF100.8 LF, incl. 5% waste

Each line is the measured quantity times the recipe’s factor. Lines the recipe marks as whole units, such as sheets, boxes and hangers, are rounded up before waste, the way the app rounds them. Round the with-waste figure up to whole pieces when you build the order.

What this cannot tell you: vertical runs the plans do not dimension, or a fitting-by-fitting count. Risers and drops are measured where the set gives a height and flagged where it does not, fittings are a starting rate per foot of pipe, and fixture models come from your own quote.

Reference

What does a plumbing order carry?

Plumbing is half counting and half measuring. The rows show where each part lives on a plumbing set, how it gets taken off, and the order lines that follow.

Lengths of pipe and tube on cantilever racks in a supply warehouse
Part of the orderWhere it is on the plansHow it is taken offWhat it becomes on the order
FixturesPlumbing plans and the fixture scheduleCounted per tagFixture by your quote, flush valve or trim, seat, wax ring, rough-in pipe and fittings
Domestic waterPlans and riser diagramsLinear feet by material, size, above or below groundCopper or PEX by size, fittings, hangers, solder or expansion fittings
Drain, waste and ventPlans and isometricsLinear feet by sizePVC or cast iron by size, fittings, hangers, primer and cement
Water heatersThe equipment scheduleCounted per tagHeater, expansion tank, drain pan, valves, unions and connecting pipe
Drains and cleanoutsPlans and plumbing detailsCounted per typeDrain body, strainer, trap, cleanout and cover
Gas pipingPlans and the gas riserLinear feet by sizeBlack steel pipe, fittings and hangers

Typical practice, not a standard. Pipe materials and joining methods change job to job with the specification, so they are read from the set.

Our view

What do supply houses get wrong about plumbing takeoffs?

Our opinion: Fittings are where plumbing quotes slip, and a percentage on the total hides them. The app's starting recipe for 3/4 inch type L copper carries 0.4 fittings for every foot of pipe, plus a hanger every six feet and solder. That rate is still an estimate, but it is set by pipe size and moves with the pipe it belongs to, which a lump percentage on the order does not. We would rather see fittings on their own lines, by size, where the counter can see the rate and adjust it for the job.

What it does and does not do

What it does today

  • ✓Counts fixtures by tag and measures pipe by system and size from drawing PDFs
  • ✓Turns each count and run into material lines, with waste shown
  • ✓Flags vertical lengths the set does not give, instead of guessing them
  • ✓Prices from your own price list first, with the source on every line
  • ✓Exports as PDF, CSV or JSON

What it does not do

  • Fitting-by-fitting counts. Fittings are a rate per foot
  • Purchase orders
  • Reading a reply or a quote back into the list
  • Links to your ERP or point-of-sale system
Free takeoff

Your first plumbing takeoff is free.

Choose a plumbing set already on your counter and we do the takeoff for free. To test the numbers first, download the recipes as a CSV.

A real set No card Your counter decides
From a customer

In a customer’s own words

“Ruh helped us win a job during the demo, so we saw value before we even became a client.”
J&S ExcavationBen MorlinJ&S Excavation
takeoffs delivered to 29 contractors across 15 trades
45
US, Canada and the UK, Jun to Oct 2026
starting recipes in this supply line, yours to edit
30
168 material lines between them
for every output, the material list included
PDF, CSV
and JSON for your own systems
FAQs

Questions plumbing supply houses ask

Plumbing supply questions, answered from the product.

What is plumbing takeoff for supply houses?

Plumbing takeoff for supply houses is counting the fixtures and measuring the pipe on a contractor's plumbing plans so the supply house can quote the whole order. Ruh handles the counts, runs, conversion and first pricing, and the counter has the final word.

Send a set. Check the fixtures and pipe.

Send a plumbing set and put the free material list next to your own count of fixtures and runs.

Get a free plumbing takeoff

No card. The counter makes every pricing call.