Construction proposal software. Approved before it leaves.

Construction proposal software turns an estimate into the bid proposal a general contractor receives: the price, the scope, what is included and excluded, the alternates and the terms, in one document. Below are the sections a Ruh proposal prints, how sign-off works before it leaves, a worked alternates example, and the free takeoff that gets you started.

Clients include

PCL Construction logoECC logoTaurus Builders logoAlliance Construction Solutions logo
Send one bid set. Get a free takeoff.

We take off one of your jobs at no cost. No card.

PDF drawings, specs and any addenda.

What you get
  • ✓Written from your budget, schedule and scope
  • ✓PDF or Word, in your own brand with the branded proposal option
  • ✓Locked until a person who may approve signs it off

Construction companies working with Ruh

  • pcl logo
  • ecc logo
  • taurus logo
  • alliance logo
  • dondlinger logo
  • spyder logo
  • comstock logo
  • limbach logo
  • adf logo
  • gldd logo
  • orion logo
  • argan logo
Quick answer

Can software write a construction bid proposal?

Yes, from your estimate. Ruh writes the proposal from the budget, schedule and scope of work in numbered sections that always print in the same order. A section with nothing behind it says so instead of printing boilerplate, and nobody can download the file until a person who may approve proposals signs it off.

numbered sections on every bid
Same order
made from the same approved document
PDF or Word
before anyone can download it
Approved first
Watch the proposal screen

What happens between the estimate and the general contractor's inbox?

A person on your team who approves proposals signs it off. The first time, they make it from the budget, which approves it. After any edit to what it prints, the estimator asks again, and they approve it or send it back with a note. Only an approved proposal unlocks the PDF and Word downloads, and the screen shows the same words and figures the file prints.

The Proposal screen on a sample drywall bid. Sample data, not a customer project.
  1. 1

    A person on your team who approves proposals makes it from the estimate's budget, schedule and scope, which approves it.

  2. 2

    After an edit to what it prints, the estimator asks for approval again, with a note if needed.

  3. 3

    The approver approves it or sends it back, and only then can it be downloaded.

The problem

Where subcontractor proposals go wrong

A proposal is a price and an offer of terms. Disputes after award often start with what it said, or did not say, on bid day.

Scope typed twice

The scope lives in the estimate, then gets retyped into a Word file, and the two drift apart before the bid date.

Exclusions nobody wrote

In typical practice, an exclusion that never made it onto the page is scope the general contractor can expect you to carry.

A late price that never lands

A number changes on the estimate at noon, and the proposal sent at two still carries the old one.

Sent before anyone checked

The proposal goes out from one inbox, and the person who owns the number never saw the final version.

An estimator measuring a printed floor plan with a scale rule, a calculator beside the drawing

Our view: Write the exclusions and clarifications before you sharpen the price. A low number with a vague scope is the most expensive bid a subcontractor can win.

Reference

What a Ruh bid proposal prints, and where each part comes from

The sections in the order they print, grouped. The figures come from the budget and the scope. The estimate run drafts the written sections from the set and your company's standard wording, your estimator edits them, and a blank one says so on the page.

SectionsWhat they sayWhere they come fromWho writes them
Proposal summary, basis of bidThe price and the documents it is based onThe budget and the basis you stateThe estimator
Scope of work, priced scopeWhat the price covers, line by lineThe scope and the budgetThe estimator, from the estimate run's draft
Inclusions, furnished by othersWhat is in, and what you install that others supplyDrafted by the estimate runThe estimator, on the Edit tab
Exclusions, clarifications and assumptionsWhat is out, and what the price depends onDrafted by the estimate runThe estimator, on the Edit tab
Alternates, allowances and unit pricesPriced options outside the base bid, and stated ratesAlternates from the budget, allowances drafted by the runThe estimator
Permits, safety, warranty, payment, change orders, validity, insurance and bonding, termsThe terms you offerYour company's standard wordingYour company, on the Edit tab
AcceptanceWhere both parties signPrinted with the general contractor namedThe general contractor and you

Grouped for this table. The proposal prints each section under its own name, such as Price validity. The general contractor and contact are filled in on the Edit tab.

A worked bid with two alternates

An illustrative drywall package. Overhead, fee and contingency compound in that order, the way the budget applies them, and each alternate carries the same markups.

Illustrative figures, not a customer job. The base bid leaves both alternates out.

  1. 1
    Base bid direct cost
    $184,000
  2. 2
    Overhead at 10 percent
    10% x $184,000 = $18,400
  3. 3
    Fee at 8 percent on the overheaded cost
    8% x $202,400 = $16,192
  4. 4
    Contingency at 3 percent
    3% x $218,592 = $6,557.76
  5. 5
    Add alternate 1, Level 5 finish in the lobby, $6,200 direct
    $6,200 x 1.10 x 1.08 x 1.03 = $7,586.57
  6. 6
    Deduct alternate 2, delete the corridor soffits, $3,500 direct
    $3,500 x 1.10 x 1.08 x 1.03 = $4,282.74 credit
Base bid: $225,149.76. Alternate 1 adds $7,586.57. Alternate 2 is a credit of $4,282.74.
Watch the budget screen

How does a bid-day price change reach the proposal?

The proposal is written from the budget, so a change starts there. Unapprove the budget, change the line or the alternate, and save. The proposal then shows Out of date until a person who approves proposals regenerates it from the budget as it now stands.

  • ✓

    Figures from the budget

    The base bid and the budget's alternates print from the approved budget. Allowances and unit prices are written on the Edit tab.

  • ✓

    A change undoes approval

    Any edit to what the proposal prints undoes the approval. The project name, client, bid date and brand do not.

  • ✓

    Alternates stay priced

    Each alternate is priced on the budget with the same markups and lands in the proposal's Alternates section.

Sample concrete budget. Overhead, fee and contingency roll up to the proposed bid.
How to start

Your first Ruh proposal in three steps

  1. 1

    Pick a live job

    The drawings, specs and addenda for a bid that is due soon.

  2. 2

    We run scope, takeoff and pricing

    Every quantity names its sheet, and every line records how it was priced.

  3. 3

    Approve it and send it yourself

    A person on your team approves the proposal, and that approves the budget too. Your team sends it.

An estimator at two monitors, one showing a floor plan, with a bound drawing set on the desk and a hard hat behind
Free first takeoff

Start with a takeoff on us

Choose a job you are pricing now. We measure it at no cost and name the sheet behind every count.

Your own drawings No card You approve every line
From a customer

A customer on the estimate behind the proposal

“Our estimators spent more time retyping quantities than thinking about scope. Ruh reads our drawings like a senior estimator and hands back a priced estimate we want to review, not rebuild.”
Director of PreconstructionADF Group
numbered sections, depending on what others furnish
18 or 19
Proposal document
start with Approve proposals
2 roles
Approver and Company admin
shown when the budget moves after approval
Out of date
Proposal screen
FAQs

Construction proposal software FAQs

What subcontractors ask before sending a Ruh proposal to a general contractor.

What is construction proposal software?

It is software that turns an estimate into the bid proposal a subcontractor sends a general contractor: the price, the scope, inclusions, exclusions, alternates and terms, laid out the same way on every bid.

Send one bid set

We take off one of your live jobs at no cost, then go through the takeoff with you in a 30-minute call.

No card One drawing set You approve every line
Start my free takeoff

Nothing to pay. You approve every line.